[current_date]
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post

URC Breaks Silence On Reports Shs25bn Used For Staff Training

August 11, 2026

KAMPALA, Uganda – The Uganda Railways Corporation (URC) has dismissed reports alleging that more than UGX 25 billion was spent exclusively on training its staff, saying the claims misrepresent a broader capacity-building programme financed under a Spanish government loan.

In a detailed clarification issued on Friday, URC explained that following the termination of the Rift Valley Railways (RVR) concession on January 25, 2018, the Government of Uganda directed the corporation to immediately take over and sustain railway operations.

The corporation said a comprehensive assessment was subsequently conducted to identify investment priorities in railway infrastructure, rolling stock and human resource capacity.

As part of these efforts, the Government secured a €28.96 million loan from Spain in 2019, under which Spanish firms Consultrans and Imathia were contracted to implement several components of the railway rehabilitation programme.

According to URC, the project covered detailed engineering designs for the rehabilitation of the Kampala–Namanve and Namanve–Mukono railway sections, preliminary designs for the Kampala Multimodal Hub, supply of 4,605 UIC 54E1 rails, rehabilitation of the 26.8-kilometre Kampala–Mukono railway line, and capacity building for URC personnel.

The corporation clarified that the €4.821 million allocated to the capacity-building component—equivalent to about UGX 20.84 billion at current exchange rates—was not dedicated solely to staff training, contrary to reports circulating in sections of the media and online.

URC explained that refresher courses for its employees formed only one part of the programme. The budget also catered for operational costs incurred by the contractor during its three-year engagement in Uganda, including remuneration for international experts, Ugandan personnel and other implementation-related expenses.

The corporation further emphasized that all project funds were disbursed directly to the contractor in Spain, adding that no money was transferred directly to URC for expenditure.

"Although these funds have been presented as having been spent exclusively on training URC staff, they were not," the corporation said.

Major Railway Projects Progressing

URC also provided an update on ongoing infrastructure projects aimed at revitalising Uganda's railway network.

The corporation said rehabilitation of the Tororo–Gulu metre-gauge railway line is progressing steadily, with construction works currently reaching Lira, while project completion and handover remain scheduled for October 2026.

Station rehabilitation is also underway along the corridor, including Mbale, Kumi, Soroti, Achuna, Lira and Gulu.

In addition, URC is implementing an African Development Bank-funded modernisation programme, which includes installation of concrete sleepers on the Malaba–Jinja, Kampala–Kyengera and Port Bell railway lines, procurement of diesel-electric locomotives, 100 high-capacity wagons, LPG tank wagons and construction of a 1,500-tonne multipurpose water vessel.

Passenger transport infrastructure is also being expanded, with new passenger hubs under construction at Namanve and Kyengera, while a new hub in Mukono is planned ahead of the 2027 Africa Cup of Nations (AFCON). The corporation also intends to extend passenger rail services to Jinja and procure additional passenger facilities.

URC noted that it has resumed transportation of domestic cargo within Uganda, describing the move as part of efforts to increase the railway's contribution to national logistics and trade.

On railway safety, the corporation said manual barriers are being installed at high-risk level crossings, while the Uganda Police Force has deployed 100 officers to protect railway infrastructure and manage traffic at critical crossing points. Procurement of automated railway crossing systems is also underway.

URC said the ongoing investments are intended to strengthen Uganda's railway infrastructure, improve operational efficiency and support the country's long-term transport and economic development objectives.

FBI Warns Businesses Worldwide of AI Tool Enabling Cyberattacks in Under Three Hours

[post_time_ago]

Mike Todd Declared Apostle After Four-Hour Ceremony, Reigniting Debate Over Modern-Day Apostles

[post_time_ago]

Somalia President Accuses UAE of Interference, Calls for National Dialogue

[post_time_ago]

NVIDIA Founder Jensen Huang Apologises, Says He Would Be Honoured to Return as CEO

[post_time_ago]

Uganda’s NRM, China’s CPC Deepen Party-to-Party Cooperation in Institutional Development

[post_time_ago]

IGG Warns of Sophisticated Fraud, Calls for Stronger Investigations

China Calls for Stable Relations with US Based on Mutual Respect

Uganda Urges EAC States to Renew Commitment to Eliminating Trade Barriers

South Sudan Postpones General Elections to February 2027

US Halts Flights Nationwide After Temporary Telecommunications Outage

Uganda Army Dismisses Social Media Reports of Troops Killed in Somalia

Victoria University Ordered to Halt Pharmacy Training for 314 Students Admitted Above Quota

[post_time_ago]
AU, African Journalists’ Federation Call for Stronger Media Protection

[post_time_ago]
Uganda, Algeria Seek Stronger Economic Ties as Kampala Welcomes $5m Grant

[post_time_ago]
Uganda Signs 3-Year Tourism Promotion Deal with German Football Club

[post_time_ago]
MONUSCO Chief Arrives In Goma As M23 Rebrands

[post_time_ago]
BREAKING: Peter Elwelu Arrested in Soroti Over Alleged Plot to Destabilise Teso

[post_time_ago]
UPDF Confirms Withdrawal of Somalia Troops, AUSSOM Exit Planned by 2027

[post_time_ago]
Ghana Calls on Britain to Issue Formal Apology for Transatlantic Slave Trade

[post_time_ago]
Mandarin Roots Deepen As Over 200 Schools Take Part in Uganda’s Chinese Language Competition Finals

[post_time_ago]
Trump Eyes Third Term Despite Constitutional Two-Term Limit

[post_time_ago]
Uganda Withdraws More Troops from Somalia as Second Flight Departs Mogadishu

[post_time_ago]
Rwanda, Russia Sign Agreement to Build Nuclear Reactor and Science Centre

[post_time_ago]

Tumwebaze Mwine: The Lawyer Championing Youth Voices in Western Uganda

[post_time_ago]

Mercy Kanyesigye Candidature Gets Rwenzori Boost as Youth Rally Behind Her

[post_time_ago]

SWORDS OUT! Namyalo to Opposition: ‘Settle 4 M7’ or Quit—Bobi Wine Targeted in “Bare Knuckles” Speech

[post_time_ago]

Kadaga Declares Bid to Retain CEC Seat, Describes It as “The Cooking Place” for Government Policy

[post_time_ago]

UG Diplomat is an independent digital news and media platform dedicated to comprehensive coverage of national politics, regional diplomacy, international relations, geopolitics, defense, and business. Published under Currentarc Media Ltd, we provide authoritative analysis, breaking news, and in-depth reporting on the diplomatic and economic developments shaping East Africa and the global arena.

COMPANY

Contact Us

Privacy Policy

Terms and Conditions

CONTACT INFORMATION

info@ugdiplomat.com

+256774552385

Copyright © 2026 UG Diplomat -Product of CURRENTARC MEDIA

Views: 1,132