November 22, 2026
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post

UNRA Executive Director Inspects Rukungiri-Kihihi-Ishasha/Kanungu Road: A Milestone in Infrastructure Development

October 21, 2024

By Joellah Anshemeza

On October 17, 2024, Mrs. Allen Kagina, the Executive Director of the Uganda National Roads Authority (UNRA), along with a team of UNRA officials, conducted an on-site inspection of the Rukungiri-Kihihi-Ishasha/Kanungu road. This 78.5km road, located in southwestern Uganda, is a significant infrastructure project designed to improve regional connectivity and enhance economic activities, particularly in the areas of tourism and trade.

Purpose of the Inspection

The inspection aimed to assess the current progress of the road works, identify any outstanding challenges, and propose potential solutions to ensure the timely completion of the project. The road is part of the larger Road Sector Support Project V (RSSP V), funded by the Government of Uganda in partnership with the African Development Bank.

The African Development Bank has contributed 85.11% of the project’s funding, while the Government of Uganda has provided 14.89%. This collaboration underscores the importance of regional infrastructure in promoting economic growth and improving service delivery.

Project Scope and Status

The project involves upgrading the road to bitumen standards, including the construction of a 7-meter-wide carriageway and 2-meter-wide paved shoulders. Additional infrastructure such as parking lanes in urban areas, bridges, box culverts, and drainage systems have also been integrated to enhance safety and durability.

While the primary construction of the road was completed on November 17, 2023, the project is currently in the Defects Liability Period. During this phase, the contractor is addressing minor issues identified during the handover. Key challenges include sections of the road that are prone to erosion, particularly along the slopes. The Director of Roads and Bridges, Eng. Sam Muhoozi, reassured stakeholders that slope stabilisation efforts would be implemented before the official handover.

Cross-Border Trade and the Ishasha Bridge

One critical component of the project, the Ishasha Bridge, remains incomplete due to security concerns along the Uganda-Democratic Republic of Congo (DRC) border. Mrs. Kagina highlighted the strategic importance of this bridge in facilitating cross-border trade between Uganda and the DRC. She emphasised that the issue is being addressed at the intergovernmental level, with hopes for a resolution that will enable the construction of this key infrastructure to proceed.

Commitment to Road Maintenance

In response to concerns raised by district leaders, the Director of Road Maintenance, Eng. Joseph Otim, assured that UNRA's maintenance team would continue to monitor and address any defects that may arise due to weather conditions or accidents after the contractor's departure. This proactive approach is intended to ensure that the road remains in optimal condition long after its official handover.

Positive Reception from Local Leaders

District leaders from Kanungu and Rukungiri expressed their appreciation for the project, noting that it has already had a positive impact on the region. Kanungu Town Council Mayor, Godfrey Karabenda, praised the quality of the work, while Kanyantorogo Town Council Mayor, John Bosco Aryatwijuka, called the road a catalyst for improved service delivery.

Ambrose Mwesigye, the Resident District Commissioner for Kanungu, highlighted the role of the road in boosting tourism and trade, despite disruptions caused by the ongoing DRC insurgency. The road has significantly reduced travel time from Rukungiri to Ishasha from three hours to one and a half hours, creating opportunities for local traders and tourism operators to reach markets faster and increase their profits.

A Call to Action for the Local Community

Mrs. Kagina encouraged local traders to capitalise on the reduced travel time, urging them to use the improved road infrastructure to enhance their business operations. By reducing turnaround times, traders can maximise their market potential, ultimately contributing to the region's economic growth.

The inspection of the Rukungiri-Kihihi-Ishasha/Kanungu road marks a critical step toward the successful completion of a project that promises to transform southwestern Uganda’s infrastructure landscape.

With ongoing efforts to address challenges and ensure the road’s durability, the project is set to play a pivotal role in facilitating trade, tourism, and service delivery, fostering development for years to come.

Ms Joellah is a Communication Officer at the Government Citizen Interaction Centre

 

 

 

 

Uganda Minister Witonze, IGAD Boss Discuss Media’s Role in Regional Integration

1 day ago

Trump Threatens Tax Penalties for US Firms Building Data Centres Overseas

1 day ago

Rubio Urges UAE to Help Bring Sudan War to an End

1 day ago

UNSG RACE: All 5 Permanent Members Discourage Uganda’s Otunnu in 9th Straw Poll

2 days ago

Trump Says Putin Wants Ukraine War Ended Through Diplomacy After China Meeting

2 days ago

Trump Says Putin Wants Ukraine War Ended Through Diplomacy After China Meeting

Museveni Witnesses Signing of Uganda’s Crude Oil Marketing Agreement with Vitol

Somalia Tells UAE Its Concerns Go Beyond Internal Political Disagreements

King Oyo Foundation: We Are Not an Alternative to Tooro Kingdom

Uganda Targets Chinese Coffee Buyers as Exports Reach US$62 Million

TRUMP DELAYS DECISION ON NEW IRAN ATTACKS UNTIL AFTER NEW YEAR

Museveni, Suluhu Launch Double Q Automotive Assembly Plant in Mpigi

3 days ago
UN Security Council Pushes Secretary-General Straw Poll to Friday, Returns to Colour-Coded Ballots

4 days ago
US, Venezuela Seal Military Cooperation Deal as Hegseth Visits Caracas

4 days ago
US Lawmakers Warn Sanctions on Rwanda Could Undermine Trump’s DRC Peace Deal

4 days ago
Carney, Trump Meet in China as Canada, US Seek Trade Deal

4 days ago
Museveni, Suluhu Agree to Fast-Track EACOP, SGR Projects

4 days ago
Sudan Court Sentences RSF Leader Hemedti, Brother and 11 Others to Death

4 days ago
Sam Mugumya, Two Others Charged with Security, Treachery Offences over Alleged ADF Links

4 days ago
Uganda Registers 34.9 Million Citizens, Cuts Passport Processing to Five Days

4 days ago
Xi and Trump Share Surprise Embrace as US President Arrives in China

4 days ago
Uganda Airlines Launches Daily Kigali Flights, Expands Network to 18 Destinations

4 days ago
Museveni, Dangote Discuss Oil Refining, Fertiliser Production and Mining Investments

4 days ago

PLU Boss Fadil Meets Kayanja, Sserwada, Grace Lubega in New ‘Patriotic League of National Religious Leaders’

2 weeks ago

Nekesa’s Land Donation Offers NRM a Path to Reduce Recurring District Office Rental Costs

2 weeks ago

Trump Admits Iran War Contributed to Republican Midterm Losses

2 weeks ago

US VP Vance Blames Iran War for Republican Election Losses

3 weeks ago

UG Diplomat is an independent digital news and media platform dedicated to comprehensive coverage of national politics, regional diplomacy, international relations, geopolitics, defense, and business. Published under Currentarc Media Ltd, we provide authoritative analysis, breaking news, and in-depth reporting on the diplomatic and economic developments shaping East Africa and the global arena.

COMPANY

Contact Us

Privacy Policy

Terms and Conditions

CONTACT INFORMATION

info@ugdiplomat.com

+256774552385

Copyright © 2026 UG Diplomat -Product of CURRENTARC MEDIA